Osubi Pilot · Live model

Powering Delta State
with sunlight, storage & intelligence.

A sovereign planning surface for governments, investors and utilities to design, simulate and deploy solar + storage across all 25 Local Government Areas — led today by the Osubi Independent Solar Power Pilot: a utility-scale, privately developed 1 MWp PV + 2.05 MWh storage plant delivered as Electricity-as-a-Service by Prime Digital Tek and Brobags, with its own distribution network, prepaid metering and bankable commercial model.

Developed, financed & operated by
Prime Digital TekBrobags
Electricity-as-a-Service for Nigeria — engineering, digital twin and capital delivery under one accountable structure.
LGAs mapped
25
Population
4.92
M
Peak demand
960
MW
Suitable land
2,010
km²
Primary project

Osubi Independent Solar Power Pilot

A standalone, privately developed solar-plus-storage mini-grid for the Osubi service area — own distribution network, prepaid metering and commercial structure. The live model carries demand, design, CAPEX/OPEX, tariff and investor returns end to end.

Solar PV
2.0
MWp
Storage
4.1
MWh
Connections
1,000
Commercial model

Electricity-as-a-Service

No capex for the offtaker. Prime Digital Tek and Brobags build, own and operate the plant and network, and sell reliable kWh under long-term prepaid contracts — starting in Delta State, replicable across Nigeria.

Build-own-operatePrepaid meteringLong-term offtake
Platform

GIS Digital Twin

Interactive maps of all 25 LGAs with terrain, infrastructure, solar irradiation and suitable land.

SatelliteSubstationsFlood zones
Modelling & AI

Engineering + AI, one workspace

Engineering-grade PV yield, storage sizing, LCOE and grid interaction — with a natural-language scenario planner for capacity, growth, EV uptake and funding.

PV yieldBattery cyclesCAPEX / IRRNL queriesMulti-LGA rollouts
Live twin

Realtime telemetry across the state

Live substation, generation and BESS state — refreshed continuously from field sensors and SCADA.

Data sovereignty

Delta-hosted

All GIS, energy and citizen data resides on state-controlled infrastructure with full audit trails.

Solar irradiance
4.7
kWh/m²/day
Peak season 5.4
Electricity access
59
%
Target 95% by 2035
Pilot capacity
1.0
MWp
+ 2.05 MWh storage
Pilot connections
1,000
Phase 2 target