MORE Agenda · Renewable Energy Digital Twin

Powering Delta State
with sunlight, storage & intelligence.

A single planning surface for governments, investors and utilities to design, simulate and deploy solar + storage across all 25 Local Government Areas — anchored by the flagship 15 MW Osubi Solar + BESS.

LGAs
25
Population
4.92
M
Peak demand
960
MW
Suitable land
2,010
km²
Platform

One digital twin. Every decision.

From satellite pixels to substation kVA — DSSEIP unifies GIS, energy modelling, AI and investor analytics in one enterprise-grade workspace.

GIS Digital Twin

Interactive maps of all 25 LGAs with terrain, infrastructure, solar irradiation and suitable land.

  • Satellite & terrain layers
  • Substations, roads, schools
  • Flood & protected areas

Energy Modelling

Engineering-grade calculations for PV yield, storage sizing, LCOE and grid interaction.

  • PV yield & losses
  • Battery cycling & lifespan
  • CAPEX, OPEX, IRR

AI Scenario Planning

Change any variable — capacity, growth, EV uptake, funding — and see impact instantly.

  • Natural-language queries
  • Sensitivity analysis
  • Multi-LGA rollouts
Solar irradiance (avg)
4.7
kWh/m²/day
Peak season 5.4
Electricity access
59
%
Target 95% by 2035
Flagship capacity
15
MW
+ 30 MWh BESS
CO₂ avoided (yr 1)
24,800
tCO₂e
Osubi project
Flagship blueprint

Osubi 15 MW Solar PV + BESS

Adjacent to Osubi Airport in Okpe LGA — utility-scale PV with 30 MWh battery storage, 33 kV grid interconnection, control building, visitor centre and a replicable engineering blueprint for the entire state.

Annual gen.
24.6
GWh
Homes powered
18,500
Jobs (peak)
420
Enter 3D twin →